Bob’s Discount Furniture

New Distribution Center

Interior build out of an existing new 672,000Sf Building Shell with 6,000 sq ft of Administrative Office and Support Space complete with finishes, HVAC systems, Plumbing systems and Electrical distribution and communication wiring. The installation of motion controlled T-8 lighting systems to 546,000 SF of racking systems, the installations of 14,000+/- lf of 32’ high racking systems, installations of IDF scanner and material tracking systems, interior and exterior security camera systems and controlled access systems and the installations of dock equipment inclusive of dock shelters, dock levelers and signal equipment. The building systems include waste stream recycling equipment including cardboard bailer systems and packaging, EPS extruders and ‘Sanitech” Auger compactor units. Power distribution from the existing two section 4000AMP Main switch provided for multiple MDP locations and power distribution to all components for the building. New HVAC systems provided for the heating and ventilation specific to the projects needs. The project included the extension of the existing EFSR Fire Protection Sprinkler System to include Hose Stations and pendant heads to the Office Support Areas.

OWNER: Bob’s Discount Furniture

ARCHITECT: Hoffman Associates

LOCATION: Perryman, MD

DELIVERY METHOD: General Construction

SCHEDULE DURATION: 7 Months